ATLAS

Installation support

A clearer path from U.S. stock to installation.

Solar pergola installation starts with ZIP code, stock size, site access, mounting condition, drainage, solar exposure, accessory loads, and installer coordination.

A clearer path from U.S. stock to installation.

Installation path

Plan the outdoor structure before the quote is final.

A pergola is a project product. The cleaner installation path depends on the real site conditions, the selected options, U.S. stock size, freight access, and local requirements.

01

Site review

Project review starts with the outdoor space, dimensions, access, surface condition, exposure, and the intended residential or commercial use.

02

Freestanding vs wall-mounted

The mounting path is reviewed against the site structure, facade connection, freestanding support needs, drainage route, and installation access.

03

Solar exposure review

Solar control is reviewed against sunlight exposure, daily use, battery-supported operation, accessory loads, and any mains integration requirements.

04

Drainage planning

Drainage is considered with roof direction, frame layout, discharge points, site surface, and surrounding architecture.

05

Mounting surface review

The installation surface and fixing conditions should be checked by the responsible installer, contractor, or project professional before final configuration.

06

Accessory and power review

Lighting, fan, side screens, glass doors, and control requirements are reviewed before quotation so the system path stays clear.

07

Installer / contractor coordination

For commercial, hospitality, architect, and dealer projects, drawings, responsibilities, and site conditions should be aligned before installation planning.

08

Packaging and delivery

Packaging, delivery access, module handling, and project documentation needs are reviewed according to market and project requirements.

Project enquiry

Review the installation context early.

Send the ZIP code, site type, mounting condition, approximate dimensions, accessory needs, and installer path so the installation review can happen before quotation.